From Prototype to Production: What Changes and What to Expect
- Admin
- Aug 25
- 5 min read
You’ve put in the work. Your prototype is built, tested, and refined. Maybe it’s even passed a few rounds of user feedback or investor demos. It’s tempting to feel like the hard part is over.
But if you’re heading into manufacturing, you’re about to enter a completely new phase — one where the rules, the expectations, and even the priorities begin to shift.
At CRINNAC, we’ve helped dozens of product teams make this exact transition. And we can tell you — what got you here won’t get you there. In this blog, we’ll unpack the biggest differences between prototyping and manufacturing, and help you prepare for what’s ahead.

The Gap Between Prototype and Product
Let’s be clear: a functional prototype is an achievement. But a prototype is a tool for learning, not a production-ready solution. It’s meant to test ideas, validate assumptions, and guide decisions.
Manufacturing, on the other hand, is about repeatability, consistency, and efficiency. It’s not about proving that something works. It’s about making it work the same way, every time, at scale — without spiralling costs or delays.
This is where the shift happens. And here’s what changes.
1. Materials and Processes
Most prototypes are made using rapid fabrication methods like 3D printing (FDM, SLA, SLS), CNC machining, or even hand assembly. These are perfect for fast iteration and short lead times.
But manufacturing requires a different approach. You might need:
Injection-moulded parts instead of 3D printed ones
Sheet metal components instead of machined aluminium
Mass-produced PCBs instead of hand-soldered boards
Tooling and jigs for assembly instead of glue and clamps
These changes aren’t just cosmetic — they affect how your parts behave, fit together, and respond to stress, temperature, or wear.
Translation is required.
This is the core of DFM — Design for Manufacture. It’s the process of modifying your design so it can be produced efficiently and cost-effectively using the real methods your manufacturer will use.
If you skip this, what worked in the lab might fail in the factory.
2. Tolerances and Repeatability
In prototyping, there’s room for manual tweaks. Maybe that part fits a bit loosely, or you trim a piece on the fly. That’s fine when you’re making one or two units.
But production doesn’t allow for that.
Your design needs to hold up to:
Tooling tolerances
Material variability
Environmental conditions
Assembly shifts
If your product only works when assembled “just right,” it’s not ready for manufacturing. This is why we stress tolerance analysis, stress testing, and full assembly simulations before production begins.
3. Assembly Complexity
Early prototypes are often assembled by hand — sometimes by the person who designed them. But in manufacturing, labour time equals cost. Every screw, clip, wire, and adhesive adds time, tools, and potential points of failure.
Manufacturing design focuses on:
Reducing part count
Simplifying joins and fasteners
Making assembly intuitive and repeatable
Designing for automation where possible
A prototype that takes 30 minutes to build by hand might need to come down to 3 minutes on an assembly line. That could mean changing everything from your housing design to internal layout or cable routing.
This is a key focus area during the DFM and DFA (Design for Assembly) phases.
4. Cost Efficiency
Prototypes often use high-cost, low-volume methods. That’s fine for early-stage learning. But once you move to production, every cent matters — especially across hundreds or thousands of units.
That’s when we start asking:
Can this part be made with a cheaper material?
Can we combine these two components into one?
Are we using standard fasteners or custom ones?
Is our component supplier the best fit for scaling?
Sometimes small changes — like moving from stainless steel to aluminium, or switching from a machined part to a pressed one — can save you thousands in the long run.
Balancing performance with cost is a constant negotiation. That’s part of the challenge — and the craft — of moving to production.
5. Supply Chain Considerations
During prototyping, it’s common to source parts from anywhere — local suppliers, online stores, even salvaged components. In production, that approach falls apart quickly.
You’ll need to think about:
Supplier lead times
Minimum order quantities (MOQs)
Part lifecycle and availability
Regional manufacturing capacity
Freight and import/export regulations
If your BOM (bill of materials) includes parts that are constantly out of stock or nearing end-of-life, you’re setting yourself up for trouble.
This is where your supply chain strategy starts to matter just as much as your engineering.
6. Certifications and Compliance
Many physical products — especially electronics — require some form of certification to be sold legally. Think CE, FCC, RCM, RoHS, or product-specific safety standards.
These regulations often introduce constraints on:
Electrical design (e.g. shielding, grounding)
Material selection (e.g. flame-retardant plastics)
Labelling and documentation
Testing procedures
If you wait until after manufacturing to think about compliance, you may find yourself needing costly redesigns or having entire batches rejected.
At CRINNAC, we advise addressing compliance early — even at the late prototyping stage — to avoid surprises.
7. Documentation and Handover
When your prototype is done, it often lives inside the head of your engineer or designer.
But when you go into production, your design needs to live on paper — clearly and completely. That means:
Engineering drawings
Assembly instructions
Quality control specs
BOMs and revision control
Firmware versions and changelogs
Production teams can’t build what they don’t understand. Clear documentation ensures your product can be made right — without you standing over every step.
From Prototype to Product: A Mindset Shift
Transitioning from prototype to production means shifting your mindset from exploring to executing. It’s no longer about what’s possible — it’s about what’s repeatable, scalable, and robust.
It’s not just about the what — it’s about the how.
How it’s made. How it’s assembled. How it holds up in the real world.
And how confident you are that it will work — again and again.
Final Thoughts
Prototyping is about learning. Production is about delivering. Both are essential — but they serve very different goals.
If you’re ready to move into production, take the time to bridge the gap thoughtfully. Don’t expect your prototype to make the leap without help. That’s where careful planning, expert guidance, and solid design-for-manufacture thinking come in.
At CRINNAC, we help clients navigate this exact stage. Whether you need a design review, DFM refinement, supplier search, or just a second opinion before tooling up — we’re here to help.




Comments